More fuel line plumbing
I have more of the fuel lines run for the stove... connecting the day tank to the stove line, and from the main tank to the day tank.
I took measurements of the day tank fittings and made a list of the adapters I needed. Then went off to the hardware store to get them... only after I got back did I realize that I was low on tubing. So, this will end on a to-be-continued (as usual).
Here is the 'list' so I made sure to get the right stuff:
Then I hooked it up... no I just have to get the main tank plumbed to the top fitting on the day tank.
I took measurements of the day tank fittings and made a list of the adapters I needed. Then went off to the hardware store to get them... only after I got back did I realize that I was low on tubing. So, this will end on a to-be-continued (as usual).
Here is the 'list' so I made sure to get the right stuff:
Then I hooked it up... no I just have to get the main tank plumbed to the top fitting on the day tank.
0 Comments:
Post a Comment
<< Home